The total job was a revision of turbine 1 of 2 of the waterpower plant in Mericourt, France, located at 50 km from Paris.
For being able to work inside the housing, a scaffolding was built, including a platform. The work included gritblasting of the steel structure and housing, air conditioning, lighting and removing of all grit blasting material.
Year of treatment: 2012 - 2013
Location: Port de plaisance de L’ilo, Barrage de Mericourt, Guernes, France
Client: Stellba Hydro GmbH & Co
Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.