Hydropower station rehab in Obervellach, Austria

The rehabilitation of the Obervellach hydropower station included the internal corrosion protection with HUMIDUR® up to a layer thickness of 600 µm. The coating is applied on the inside of the pressure pipeline and distribution pipeline.
 

Hydropower station rehab in Obervellach, Austria

The length of the pipe is 810m with a diameter from 1100mm up to 1200mm.
The distribution pipeline has a length of 64m and a diameter of 1100mm.

 

Hydropower station rehab in Obervellach, Austria

 

Facts: 

  • Start of the project: September 2011
  • End of the project: December 2011
  • Exact location: Obervellach, Austria
  • Client: OBB Infrastruktur AG - Kraftwerk Obervellach
  • Applicator: Sepero Korrosionsschutz Ges.m.b.H 
  • Treated surface: 3000m²
  • Applied products: HUMIDUR®  ME

 

Hydropower station rehab in Obervellach, Austria
 

Jobreport

Humidur

Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.

Member of:

Chinese Classification Society American Bureau of Shipping American Association of Port Authorities The European Small Hydropower Association The International Association of Ports and Harbors National Association of Corrosion Engineers  The World Association for Waterborne Transport Infrastructure The Society For Protective Coatings British Hydropower Association

Enter your e-mail address and receive our newsletter!