This job includes an anti-corrosion treatment of 429 current meters on Quay A and 252 current meters on Quay B, located in the Van Cittershaven. The height of the SSP which needed to be protected was 6,5 meters. The lowest level to be treated was -1,5m below the average low water level.
Facts:
Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.