Dubai Aluminum - Dubai

At the start of this project, the pipes were badly covered with a tick biofilm of 10 - 15 cm. The three pipes in total were each individually drained, thoroughly cleaned and protected.

Dubai Aluminum - Dubai

The Humidur coating was applied for interior protection of steel seawater intake pipes. There was an additional protection of CP - sacrificial anodes applied, which was not necessary, but preferred by the client.

The thickness applied inside these pipes was 800 microns. The total length of three coated pipes, was 1240 meters. The diameter of the pipes is about 2 meters.

Dubai Aluminum - Dubai

The salt water was used for cooling of the aluminium producing process, for generating waterpower and for desalination to drinking water.

Facts:

  • Start of the project: May 2004
  • End of the project: August 2004
  • Exact location: Dubai Aluminum Plant, United arab emirates
  • Name client: Dubai Aluminum company Ltd., Dubai, United Arab Emirates
  • Treated surface: 7850 m²
  • Applied products: Humidur

Dubai Aluminum - Dubai

Humidur

Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.

Member of:

Chinese Classification Society American Bureau of Shipping American Association of Port Authorities The European Small Hydropower Association The International Association of Ports and Harbors National Association of Corrosion Engineers  The World Association for Waterborne Transport Infrastructure The Society For Protective Coatings British Hydropower Association

Enter your e-mail address and receive our newsletter!