The bridge pier protection islands are constructed of steel sheet pilings that needed to be protected from corrosion.
In total, four caissons have been treated with Humidur down to 6 meters below the water level. This job required an experienced company to deal with the multiple difficulties due to large tidal changes and often large swell.
Facts:
Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.