This project included pre-coating of flat plates (4,5m wide by 3,0m high), which were installed by means of Acotec’s DZI mobile cofferdam.
The plates are attached with special bolts to the existing sheet piles. The empty area’s created in the inpans of the existing wall, are filled with a special formulated concrete to create an armoured wall behind the plates.
Overview of the active quay while the quay wall is being restructured with the DZI limpet.
Facts:
Applying Humidur at onsite workshop and lowering the Humidur pre-coated plates.
The job was to refurbish 6000 current feet (2km) of quay wall.
Close-up on the installed Humidur coated plate, still with empty inpans behind the plate.