Interior protection of a concrete pond for secondary waste water treatment.
The Ansan Combined Cycle Power Plant was built by S-Power, the joint venture between Posco E&C and Samchully Co. The plant is fuelled with liquefied natural gas (LNG) and has an efficiency of 61%.
Year of treatment: 2014
Name client: Posco E&C , Samchully Co.
Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.