Acotec carries out a project at the Purfleet Terminal (UK) commissioned by C-RO Ports. The project involves the lengthening of drainage pipes and conservation of pile foundations. Humidur is applied as anti-corrosion coating. The piles are coated during low tide. Up to now, the WEB deck (alternative for scaffolding) has been installed and the drainage pipes have been coated. The following steps will include the repair of perforations in the piles and the application of Humidur.
Technical documents, data sheets, specification sheets and much more information are all available on www.humidur.be.