Humidur FP Single was applied as internal lining of the CW Y piece of the Heysham 2 nuclear power station, operated by EDF Energy. The application took place from the 3rd to the 6th of June 2018.
Utilising RPR heat induction, remove the retained coating system from 260m² of internal pipe work. Mechanically prepare the substrate to achieve a minimum BS EN ISO 8501-1 ST3 visual standard of preparation.
Installation of an approved protective coating system compliant with the clients specified requirements.